Report From Mojacar Town Hall Confirms Works at La Cadima Were Halted in 2008
February 15th, 2012
We are in receipt of a lengthy report from the Town Hall confirming that the works on Playa Macenas were indefinetely halted by the Mojacar Town Hall on the 12th of June 2008, instigated by the architects (who are owed subtantial sums, as confirmed by them) and the building contractor (equally owed very large sums).
We are advised that Citrus Playa Macenas S.L. started the works on September 2007 and suspended them, indefinetely, on the 9th of May 2008, after which it was communicated to the Town Hall.
Documents
- Mojacar Town Hall Report – Playa Macenas Ready2Invest (PDF – 2.3 Mbytes)